Returning Lines Granny Skirt | Side-to-Side Crochet Wrap Skirt Pattern
Returning Lines Granny Skirt | Side-to-Side Crochet Wrap Skirt Pattern
Couldn't load pickup availability
A familiar granny stitch, turned another way, with room for your own lines to return.
The Returning Lines Granny Skirt is worked side to side in one open wrap panel. Cream and olive rows run from waist to hem, dusty-mauve short-row pairs add fullness along the lower edge, and deep-brown crochet ties secure the waist.
Follow the eight-full-row repeat, two lower short rows, edging and tie instructions. Use your own blocked gauge, hip measurement and desired length to choose and adjust your plan.
- Digital download: matching PDF and editable Word pattern, plus a labeled construction-sequence schematic.
- US crochet terms. Intermediate skill level.
- Five measurement-based width plans cover a hip planning range of 34–64 inches; check your actual overlap and fit.
- Four approximate length options, about 23–29 inches, with gauge-based formulas for adjustment.
- Size 4 cotton-blend yarn, 5.5 mm starting hook, and an optional 5.0 mm hook for firmer ties.
Dimensions and yardage are planning estimates; all-size physical testing is not claimed. Wear an opaque underlayer with the open granny fabric. The image shows construction order, not a photograph or the finished garment shape. This purchase is for digital instructions; no finished skirt, yarn or materials are included.
Share
